Civil Engineering • Structural Engineering • Building Design • Surveying
This structure is the third building in the Lanz Cabinets campus, which was completed in 2007. It is a concrete tilt-up building with a pre-engineered metal roof system containing approximately 60,000 square feet. The office design features a high ceilinged reception area with meeting rooms and offices on the first floor and on the balcony above.